Doğan, S Z, Arditi, D and Murat Günaydin, H (2008) Using Decision Trees for Determining Attribute Weights in a Case-Based Model of Early Cost Prediction. Journal of Construction Engineering and Management, 134(02), 146–52.

Ergen, E and Akinci, B (2008) Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains. Journal of Construction Engineering and Management, 134(02), 112–21.

Eriksson, P E (2008) Procurement Effects on Coopetition in Client-Contractor Relationships. Journal of Construction Engineering and Management, 134(02), 103–11.

Isaac, S and Navon, R (2008) Feasibility Study of an Automated Tool for Identifying the Implications of Changes in Construction Projects. Journal of Construction Engineering and Management, 134(02), 139–45.

Leung, M, Zhang, H and Skitmore, M (2008) Effects of Organizational Supports on the Stress of Construction Estimation Participants. Journal of Construction Engineering and Management, 134(02), 84–93.

Xiong, Y and Kuang, Y (2008) Applying an Ant Colony Optimization Algorithm-Based Multiobjective Approach for Time–Cost Trade-Off. Journal of Construction Engineering and Management, 134(02), 153–6.

  • Type: Journal Article
  • Keywords: Optimization; Cost control; Time factors; Algorithms; Project management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:2(153)
  • Abstract:
    The time–cost trade-off is one of the most crucial aspects of construction project planning, which in fact is a combinatorial optimization problem. This technical note employed an evolutionary algorithm—ant colony optimization (ACO) algorithm to deal with the time–cost trade-off problems. Combining with the modified adaptive weight approach, the ACO algorithm can find out the optimal solutions, and define the Pareto front as well. The development of the ACO-based multiobjective approach in this technical note provides an attractive alternative to solving construction time–cost optimization.

Ye, S and Liu, Y (2008) Study on Development Patterns of Infrastructure Projects. Journal of Construction Engineering and Management, 134(02), 94–102.

Yu, A T W, Shen, Q, Kelly, J and Hunter, K (2008) Comparative Study of the Variables in Construction Project Briefing/Architectural Programming. Journal of Construction Engineering and Management, 134(02), 122–38.